Information provided on this site is promotional in nature

Services & Pricing

Transparent pricing for professional television set design services.

Initial Concept Development

£2,850

The foundation of any successful set build. We take your creative brief and production requirements, then develop visual proposals that balance aesthetic goals with practical constraints.

What's Included:

  • Initial consultation and brief analysis
  • Three distinct design directions with mood boards
  • Preliminary spatial planning and layout sketches
  • Material and color palette recommendations
  • Budget estimate for full implementation

Typical timeline: 7-10 business days from brief to presentation.

Technical Drawing & CAD Modeling

£4,200

Precise documentation that construction teams can work from with confidence. Every dimension specified, every material noted, every connection detailed.

What's Included:

  • Complete floor plans with dimensions
  • Elevation views from all necessary angles
  • 3D CAD models for visualization
  • Material specifications and sourcing notes
  • Structural considerations and load requirements

Typical timeline: 10-14 business days, delivered in multiple formats including DWG, PDF, and OBJ.

Material Selection & Sourcing

£1,950

Materials behave differently under studio lighting than they do in typical architectural contexts. We identify options that meet both aesthetic requirements and performance needs.

What's Included:

  • Material research based on design requirements
  • Sample procurement and lighting tests
  • Cost comparison and availability verification
  • Supplier coordination and ordering assistance
  • Alternative material recommendations for budget optimization

Typical timeline: 5-7 business days, with physical samples provided where applicable.

Set Construction Supervision

£5,400

On-site presence during the build phase ensures design intent translates accurately into physical reality. Problems get solved while solutions are still straightforward.

What's Included:

  • Regular site visits throughout construction
  • Quality control and specification adherence verification
  • Problem-solving and design adjustment as needed
  • Coordination between design team and construction crew
  • Progress documentation and reporting

Typical engagement: 2-4 weeks depending on project complexity, with visits scheduled around critical build phases.

Lighting Design Integration

£3,150

Sets and lighting design are interdependent. Surface textures affect light behavior. Colors shift under different lighting temperatures. We work with lighting directors to optimize both systems.

What's Included:

  • Coordination meetings with lighting department
  • Surface texture and finish recommendations
  • Color temperature and reflectivity planning
  • Material adjustments based on lighting requirements
  • Testing protocols and final verification

Typical timeline: Coordinated with overall production schedule, usually 3-5 consultation sessions.

Post-Production Support

£2,100

Productions evolve once filming begins. Script changes require set modifications. Directors discover new camera angles that need accommodation. We remain available for these adjustments.

What's Included:

  • On-call availability during production period
  • Quick-turnaround modifications and adjustments
  • Problem-solving for unforeseen issues
  • Coordination with art department on changes
  • Documentation of as-built conditions

Typical engagement: Retainer-based availability throughout filming period, with response within 24 hours for urgent issues.

Ready to Discuss Your Project?

Get in touch to talk through your production's specific requirements.

Contact Us